10000 sqm - 20000sqm Warehouse for leasing in Quang Minh 1 industrial park

KCN Quang Minh, Mê Linh, Hà Nội, Mê Linh, Hà Nội

Listed:

Negotiable

Asking Price

Key details

Property Type: Warehouse
Size: 10000 m2

Description

WAREHOUSE FOR LEASING IN QUANG MINH 1 INDUSTRIAL PARK
INDUSTRIAL WORKSHOP WAREHOUSE IN QUANG MINH 1 IP

Areas: 1500 sqm - 20000sqm

Reasonable rental rate.
WAREHOUSE FOR LEASING: Long term

For more information, Pls, contact:

1. (Mr.) 0944 725 310

khiem@batdongsankmass.com

2. (Ms.) 0944 716 795

van@batdongsankmass.com

084 4 6 273 3819

2/1 Kham Duc, Kham Thien, DD, Hanoi, Vietnam

Kmass Property Advisory JSC Vietnam

http://www.batdongsankmass.com
http://www.chothuekho.batdongsankmass.com
http://www.chothuexuong.batdongsankmass.com
http://www.datcongnghiep.batdongsankmass.com
http://www.vanphong.batdongsankmass.com
http://khoxuongtaihanoi-vietnam.blogspot.com/
https://www.facebook.com/kmass6688

Introduction of Quang Minh 1 industrial park

Priority business lines: Assembly industry of Electronic products, Food processing industry, Light industry, consumer products, jewelry production, precision electronic components production, motorcycles, cars, electricity appliances production, mechanical engineering ..

1. Location: The Quang Minh 1 industrial park, Me Linh, Hanoi located by side of The North Thanglong – Noi Bai high way and Hanoi – Lao Cai railway, closed to International Noi Bai air port.

2. Distance to Hanoi: 15 km from the center of Hanoi City

3. Nearest seaports: 100 km to Hai Phong port and 120 km to Cai Lan port.

4. Nearest Airport: 3 km from Noi Bai airport

5. The nearest railway station: 15 km to Hanoi railway station

Infrastructure:

1. Roads: internal road is designed with industrial standard. Main internal traffic road is 36 meter wide and branch internal road is 24 meter wide. Traffic lighting system is designed along with internal road.

2. Electricity: Power is provide stably from High Voltage Line of Hanoi. Total power capacity if 60,000 KVA. The electricity network is provided along the internal roads in the industrial park. Investor build power station as voltage consumption.

3. Water: Clean water supply system is connected to each industrial lot.

4. Communication: Telecommunication system is designed with international standards and ready to meet the communication needs. Under ground cable system is directly connected to each industrial lot.

5. Garbage disposal system: Garbage is collected, assembled and transported to the place of treatment as prescribed

6. Wastewater treatment system: Waste water and industrial waste water is treated to meet C minimum level standard under Vietnam standard before discharging the industrial park wastewater system.

7. Finance system: Vietcombank, Maritime bank, ACB Bank, Techcom bank and Bank for Rural Agriculture and Development

8. Training School: There are a lot of universities and Colleges as well as Multidisciplinary & Multi-sector Vocational Training centers in Hanoi.

9. Housing for workers: There are housing blocks for workers and experts

10. Other add-ons: Fire fighting system is designed under national standards, the fire pillars are arranged along with industrial internal roads (about 100 meters/unit-120 meters/unit).

11. The planned areas: ​​344 hectares
http://chothuekho.batdongsankmass.com/bds/bds-thuong-mai/2850/176/cho-thue-kho-khu-cong-nghiep-quang-minh-1-1500-m2.aspx

amenities

  • Bank / ATM

location

Related Properties

Latest properties